Cabled

April 03, 2006

Things I do when the boyfriend is gone...again

1. eat at odd hours, if I eat
2. bake 4 dozen cookies in the middle of the night
3. play with the bf's computer and look through all the fun files he has

4. eat cookies for dinner and lunch
5. knit a hat:

Cabled Hat

Pattern: Cabled (pdf)
Yarn: Malabrigo Merino in Sealing Wax
Needles: Addi Turbos 4.5mm

I could have finished this last night if it wasn't for number 2 and 3 in the list. I needed a quick knit before I dive back into 'sockpal: the sequel'. Seems I knit this at the right time, today has been a cloudy and cold day. Apparently it's going to be like this the whole week. I'll gladly wear this hat every day, it's super soft and fits me perfectly.

I didn't mean to make any mods, but maybe my bad mojo got into this knit. In the increase round I made a new stitch between every stitch, resulting in 7 pattern repeats instead of the stated 6. I'm not sure if I did that wrong or not. I also omitted the pompom out of sheer laziness.

6. watch an episode or two of "our shows" without him
7. get mad when he mentions seeing meredith knit while he changes the channels at hotel (I haven't seen this episode yet, so everyone just stop talking about it or add a spoiler alert!)
8. watch 'good night and good luck' and wonder if I liked it or not. still not sure
9. actually do the dishes and keep the apartment reasonably clean (this will all change once he's back)
10. listen to all the new podcasts and develop a mild crush on Ricky Gervais

April 02, 2006

The L Word

L for looooser. As used in: "I've been a knitting looooser this week."

You wouldn't believe me from my lack of posting, but I've been knitting A LOT this week. Really. I have. I've been knitting, but I haven't knitted anything. Big difference. I think I might have angered the knitting gods this week, they stripped me of any good luck I had in me. Why would they do this to me? Maybe because instead of diligently working on my sockpal socks and casting on for the second one, I tried and tried to get some selfish knitting in. I have no idea why all of a sudden I just needed to cast on for something, ANYTHING, else. Sometimes I would pass the time by staring at my stash, as if somehow enlightenment would strike me. It didn't.

I did finish the first sock in the sockpal marathon:

IMG_4966.jpg
This week has been a haze, but I think I finished it on Thursday, maybe Wednesday. I knit till I had an 8 " leg, I could have kept going since I still have half an ounce of yarn left from the first skein but my soul couldn't take it. I promised myself, after all the bad knitting mojo, that I would cast on for the second one tomorrow. I'll admit that the sock knits up pretty quickly, it's my lack of attention that's been slowing it down. The easy pattern makes it the perfect "on the go knit", or in my case the perfect "sitting on my ass in front of the computer while bloated Photoshop takes a year to load". Hopefully I'll see some significant progress this week, something like casting on would be good.

For your enjoyment, here are some of my knitting failures and one success (for now):

Lonely swatch

I swatched for Diamonique last weekend and was so excited when I got gauge right away. In all my glory I forgot to check how much yarn is in the stash. I'm about 200 yards short and I don't have any other yarns in the stash that are the right weight. Thwarted!

DOA

Undetered to start something new, I decided to cast on for bpt with no gauge swatch or anything. I had swatched this yarn before, what was I worried about? Do I even need to tell you what happened? Yep, I had swatched for it AND I got the same gauge while knitting this, BUT it's not the same as the pattern gauge. For some reason I had remembered this yarn knitting at 5 spi, though I'm not sure where I got that number from (I could guess where) because this knits at 4 spi. Sure, I could swatch again on bigger needles. I could. The only thing stopping me is that increase row. I nearly died trying to figure out what the pattern wanted me to do. I need to rip this out and come up with my own pattern. I'm thinking a zippered jacket with a high collar. When will that happen? Don't know.

Cashmere sock

I started to think that maybe what I needed was a palette cleanser. Kerrie had sent me a partial skein of her cashmere sock yarn, in pink no less. The yarn is sooo soft, I constantly stop to pet it. I would be further along if it wasn't for the gripping fear that I won't have enough yarn to knit two ankle socks (with having two feet and all) and the mindnumbingness of straight stockinette. Do I keep going? Or do I knit something else with this yarn? Like what? I think I have just a little over 200 yards and I'm knitting with 2 mm's.

Cabled

The one winner, which was so close to being a looooser. This is Sauniell's cabled hat pattern. (pdf). I orignially started it on Saturday afternoon, but the first time I twisted the caston, the second time I fell asleep while knitting (I was really tired yesterday) and the third time is what you see. Finally! I love everything about this hat so far. I'm using a lone skein of Malabrigo (sealing wax) that I had in my stash, it works as my first April knit for project spectrum (it's orangey I swear), and I get my cable fix in a quick knit. I'll try to post a detail shot tomorrow because I love the cables. With my luck though I may have to find a kid to give it to.

March 23, 2006

A Belated FO and the Start of Something New

IMG_4844.jpg

Look what we have here! A finished sweater! I've been meaning to blog about this one, but I just haven't had a chance.

Yarn: Hipknits silk in "barbie pink" (not really, it was custom)
Pattern: Angelica Tunic
Needles: Addi Turbos 5mm, 24" and 4mm, 24" circs
Date Started: 2.18.06
Date Stated to Ignore: 2.27.06 (a new stat I'm starting)
Date Finished: 3.18.06

Soooo this would have been a fast knit really. The last time I even mentioned it all I needed were the sleeves and maybe to redo the bindoff. Easy enough right? Except for some reason I just couldn't get myself to do it. Actually, that's a lie, I know exactly why I didn't touch it. I wanted to knit the sleeves in the round, BUT I didn't have circs long enough to do it. I never made it to the yarn store to get some AND I didn't have any dpn's in the right size either. So there Angelica sat, next to my bed every night mocking and taunting me. Finally she reminded me that I had a wedding shower to go to and nothing to wear. I really didn't feel like shopping, so I had to knit. The wedding shower was on the 18th, I decided on this brilliant idea on the 15th at ohhh 11 at night.

That night I ripped the bindoff and kept going till just before the hip increases. The next day (the 16th) I started knitting the body again and added a few more increases and also about an inch (maybe 1.5") in length. I was finally ready to meet my nemesis, the sleeves. What did I do? I went and finished the neck trim. I picked up all the stitches that night and finished the knitting on the 17th, when all was left to do were the sleeves. I still didn't have any new needles, so I forced myself to use what I already had. I found some 29" Clovers in the right size. OH. MY. GOD! I hate those damn needles. The join makes it impossible to knit in magic loop with ease. I spent most of my time trying to push the stitches up from the cord onto the actual needles. I never want to see those needles again (if you want them, then let me know). Once I decreased enough stitches I switched to my beloved addis and flew through the rest of the sleeve. By dinner time I was done and ready to start on the second sleeve. I ended up going out to dinner, then watching a movie, and maybe knitting a little just before I went to sleep. Not good! I woke up on Saturday morning extra early to get the sleeve done. I still had to weave in all the ends and seam that little bit in the underarm. The wedding shower was at 5 and we still had to get ready and drive an hour and a half to get there. With three shots of espresso in me I worked on the sleeves till a little past noon. I still had the purl ridges to go! We left the house at 1:30 and in the car I finished the sleeve and just started weaving in ends like crazy. At around 3, we got to our family's house and I seamed the underarms and finished weaving anything in. I forgot something important though, the button. At that point I didn't care, it didn't even faze me. I just looked through my boyfriend's house for a pin and used the best one I could find. Needless to say, there's been no blocking of any sort on this sweater.

After all that, what do I think? I think this was a great knit, an easy piece with some really pretty details. I didn't stray from the pattern at all other than adding some length to the body. I love the fit, I went for zero ease totally ignoring this conversation. The hipknits silk is super soft and easy to knit with. It did fuzz on my skirt a little, but I love the drape and feel of it so I forgive it. This was my first time knitting with a 100% silk and I definitely see myself doing it again. I think I will knit this sweater again, but next time in some cotton (totally ripping Illanna off) and without the neck detail. I hate to admit it, but I really liked the way the sweater looked with a more opened neckline (like Katie's). I really don't mind if it draws more attention to my chest (like I can somehow draw attention away from it, hah!), does that make me a slut or something?

Moving on....

Inspired by Leah, I decided to go around my kitchen and find some pinks and red for you. Of course, I had to throw some yarn in the mix. Can't fault me for that!

march mosaic

I'm sure there's more around here, but I tried to keep it to one room. What you really care about is that yarn, isn't it? I forgot to mention that in my selfless act of ordering some yarn for my sockpal, well, I also helped myself to some luscious colors with no patterns in mind.


IMG_4840.jpg

Sundara sock yarn in Cherry Blossoms

IMG_4842.jpg

Sundara sock yarn in cirque

And what became of that gorgeous yarn I showed you the other day?

IMG_4709.jpg

I think I've frogged this sock maybe three or more times. The first time I had the wrong number of stitches and the rest were just because I couldn't decide on a pattern. I really want my pal to be happy with his socks, but at the same time I want to make sure I finish these in time. I finally decided on a simple mock cable stitch, basically a k3 p2 rib but with a little decreasin-increasin action thrown in. I'm already six inches into the foot, but I'm still having second thoughts. What do you think of this pattern?

November 2008

Sun Mon Tue Wed Thu Fri Sat
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30

patterns

Upcoming Projects

  • sweater overload

Knitters

Button

Email

Subscribe

Subscribe to this blog's feed

Credits

Design by Diana
Powered by Movable Type 3.2
Hosted by LivingDot

all photos and content copyright 2005-2008 yahaira ferreira
all rights reserved
do not use without permission.
ie. DON'T STEAL!!